|
Jun 13 2020 |
CEMP488 |
BIM Modeler and Site coordinator |
Autocad2018, MS Office, Revit Architecture 2020, Dynamo BIM, Revit Structure 2020, Quantity Survey-BOQ, Adobe Photoshop, Synchro pro 2017, Navisworks Manage 2020, Bluebeam |
4 Years 0 Months |
42 daily |
|
Jun 13 2020 |
CEMP487 |
Safety Coordinator |
advanced certificate in wsh , confined space assessor , Building Safety Supervisor , work at height assessor , lifting supervisor , work at height supervisor , Auto Cad , MS word & Excel , power point |
19 Years 0 Months |
45 daily |
|
Jun 13 2020 |
CEMP486 |
M&E - Project Coordinator |
Maintain MIS Report, updating online/offline report. Creativity, Planning, Organizing Meeting, Training and Evaluation skills, Documentation Skills Computer...,Computerization of outreach, clinical and project level data on daily basis. ï‚· Lead M&E system and process development, creating a framework and procedures for...,Report building |
5 Years 0 Months |
43 daily |
|
Jun 12 2020 |
CEMP485 |
TIG ARC MIG Welder |
WELDING, MIG, ,Arc Welding, CO2 Welding, Gas. TIG Welder,Structure Welding, Aluminum Welding |
9 Years 0 Months |
39 daily |
|
Jun 12 2020 |
CEMP484 |
Welder |
Saw welding ,Co2 welding,Arc welding,Welding, Driving, Computer Operating,Welder Lead Welder Pipe Welder |
8 Years 0 Months |
38 daily |
|
Jun 12 2020 |
CEMP483 |
Junior Electrician |
Maintenance Technician Jobs,BASIS, MICROSOFT WINDOWS,Using test equipment , hand tools to diagnose, locate & fix electrical problems,Tracing, diagnosing and rectifying ,electrical faults,Crew Member |
4 Years 0 Months |
38 daily |
|
Jun 12 2020 |
CEMP482 |
Manufacturing Supervisor |
Technician, supervisor machine shop,prepare the list of raw materials, as per the receipt of new drawings, from design office. Maintain the manufacturing schedule, for completions of machines. House |
5 Years 0 Months |
2500 monthly |
|
Jun 12 2020 |
CEMP481 |
Electrical Site Supervisor |
Responsible for lay out draw for commissioning work, Responsible for execution work,Sona Koyo Steering Systems Limited CNC , VMC operator at first line in Production,Electrical Site Supervisor, electrical errcation ,estalation gss estalation,Det of line ,ceps in Handel ,joint wallding |
5 Years 0 Months |
2600 monthly |
|
Jun 11 2020 |
CEMP477 |
General Worker |
Store management, staff management, accounting,Data entry work, online form filling, ms office work |
6 Years 0 Months |
36 daily |
|
Jun 11 2020 |
CEMP476 |
Furniture Designer |
Photoshop, Space design, Concept Development,Light ing, decor Material Exploration, Metal, Wood,Furniture Designer,Natural Fiber |
4 Years 0 Months |
39 daily |
|
Jun 11 2020 |
CEMP475 |
General Fitter |
General Fitter,Mechanical Fitter,MICROSOFT OFFICE, POWERPOINT, WORD, Excel,Apprenticeship,• Computer Knowledge,Working knowledge of computer operating system,windows and Microsoft office |
5 Years 0 Months |
36 daily |
|
Jun 11 2020 |
CEMP474 |
CAD Engineer |
AUTOCAD, PRO/E, EXCEL, POWERPOINT, WORD,AutoCAD 2018,Preparation of Structural Drawings,Drawings preparation in CAD software |
7 Years 0 Months |
42 daily |
|
Jun 11 2020 |
CEMP473 |
AutoCAD Draughtsman |
AutoCad MS Word, Exel, Powerpoint. Internet Browsing & Surfing,built drawings,drawings in Autocad,Machine layout drawings |
6 Years 0 Months |
38 daily |
|
Jun 10 2020 |
CEMP469 |
Electrical Supervisor |
ELECTRICAL ENGINEERING , Computer Operating, Electrical Maintenance, Autocad, Site Engineer, testing engineer, Marketing Engineer, Electrical supervisor |
2 Years 0 Months |
2600 monthly |
|
Jun 10 2020 |
CEMP468 |
Electrical Foreman |
PETROLEUM, REFINERY, OIL REFINERY, MAINTENANCE, AUTOCAD, AutoCAD, SAP,Operation & Maintenance Performed routine maintenance on various Tasks, PPM & equipments to optimise performance & Improve operational,Electrical Foreman works |
2 Years 0 Months |
38 daily |
|
Jun 10 2020 |
CEMP467 |
IT Technician |
Routing and switching, L2 Desktop Support, Server support, Wireless surveys and installations, Hardware installation and configuration, Operating System Support, Technology Refresh, Upgrades, Virus mitigation, CCTV Camera |
5 Years 0 Months |
43 daily |
|
Jun 10 2020 |
CEMP466 |
HVAC Technician |
Responsible For Fcu, Ahu, Condender Unit Assembly In As Per The Drawing. All HVAC Unit Assembly Construction Through CAD Drawings. Responsible For FCU, AHU, CONDENSER, Unit Assembly In Low Air Gap, And Leakage. Handling Sheet Metal Punching and bending process In plant, Excellent Relationship Skill Problem Solving In Assembly Line And Finally taking good Product Take Out. |
4 Years 0 Months |
42 daily |
|
Jun 10 2020 |
CCEMP465 |
Production Engineer |
Production, Installation, Quality, Maintenance & Services,Production planning & control with material & manpower as per the customer schedule. Monitoring daily in-house,Manufacturing, Production Engineer, Inventory Management, Quality Management,Production Engineer works |
5 Years 0 Months |
40 daily |
|
Jun 09 2020 |
CCEMP464 |
Scaffolding Supervisor |
Scaffolding Coordinator,Scaffolding Superintendent,Scaffolding quality Inspector,scaffolding inspection, safety Audit |
19 Years 0 Months |
2800 monthly |
|
Jun 09 2020 |
CCEMP463 |
Plumbing foreman |
Plumbing piping foreman,Novec suppression system,Fire fighting fire protection system,Plumbing piping instrument foreman , Excel, Personal Assistant Experience, Microsoft Word, Microsoft Outlook, Public Relations, Leadership Experience |
23 Years 0 Months |
40 daily |
Showing 281-300 of 523 items.